Japan has vast potential for solar and wind power generation in many areas across the country. To fully utilize its potential and to ensure stable power supply, it is essential to develop electricity grids that efficiently transmit electricity from power plants to demand areas. Developed nations are aiming to decarbonize the electricity sector by 2035, and measures to strengthen the electricity grid are required urgently. Interregional power grid projects are being planned not only in Europe and the United States, but also in Southeast Asia, East Asia, India, and other regions.
Renewable Energy Institute carries out studies to  investigate how interregional connection lines should be developed in Japan with a view to realizing international interconnection lines in the future.

Highlights

11 April 2024 Column
Curtailment Increases Across Japan: Economic Dispatch and Negative Prices Are Key Solutions
Romain Zissler, Senior Researcher, Renewable Energy Institute
28 November 2023 Event
Renewables and Decarbonization of the Electricity Grid
7 April 2023 Report
2050: Decarbonizing Grid Systems with Renewables
19 January 2023 Column
International Power Interconnections Progress and Help Countries in the Energy Crisis
Romain Zissler, Senior Researcher, Renewable Energy Institute
26 March 2021 Report
Verification of Electricity Supply-Demand Balance and Costs in 2030
9 April 2019 Column
Renewable Energy Curtailment in Japan: Room for Improvement
Romain Zissler, Senior Researcher, Renewable Energy Institute
17 December 2018 Study
Integrating Renewables into the Japanese Power Grid by 2030: A frequency stability and load flow analysis of the Japanese system in response to high renewables penetration level
30 November 2018
Growing Capacity of Renewables: Renewables Temporarily Supply More Than 70% of the Electricity Demand in Many Service Areas Across Japan: Findings from Supply-Demand by Area Data for the 1st Quarter of FY2018
Keiji Kimura, Senior Researcher, Renewable Energy Institute
2 March 2015 Report
Power Grid Integration and Balancing of Renewables:  Cases of Germany, California, Denmark by Eric Martinot
Reports by the Asia International Grid Connection Study Group
23 October 2019  Report
Asia International Grid Connection Study Group Third Report
14 June 2018 Report
Asia International Grid Connection Study Group Second Report
9 April 2017 Report
Asia International Grid Connection Study Group Interim Report
 

Back to Renewable Energy top page

External Links

  • JCI 気候変動イニシアティブ
  • 自然エネルギー協議会
  • 指定都市 自然エネルギー協議会
  • irelp
  • 全球能源互联网发展合作组织

This website uses cookies. By continuing to browse this website, you are consenting to our use of these cookies.

I agree